SECOND BRIDGE AT BOX CANYON TRAIL COMPLETED

Mark Telegin has been working on two bridges for the Box Canyon Trail since last summer (donating logs, getting logs milled, engineering details of the bridges, and manufacturing all the parts).  The first bridge was put in about 10 days ago.  Over the past few days, he and Steve Russell built the second bridge in his garage and then took it apart.  Today, we hauled everything to the second creek crossing and built the whole thing.  I think it came out great.
If you haven’t hiked this trail, you should.  It’s easy, short, shaded, cool, and quiet, except for the rushing of the adjacent Sacramento River.  Park just north of the dam at Lake Siskiyou, and take the trail on the northeast side of the dam toward the east, along the south side of the golf course.