NEW, ACCURATE MAP AT GATEWAY TRAILHEAD

After considerable effort walking the entire Gateway Trail system to obtain accurate GPS data, a new map was created and placed on the trailhead kiosk on Sunday, Sept. 30, 2018. It includes the new Lollipop Trail, the correct alignment for Pig Farm, the Foundation Trail, removal of “Fern Loop,” naming of major intersections, and accurate mileage measurements between all these locations. Several “you are here” signs will soon be placed at strategic locations within the trail system . Pictured is Paul Schwartz, who has been instrumental in getting this project done properly.