Even though the weather looks a little iffy, our volunteer contractor apparently has the equipment we need and is ready to work.
We’re going to try driving in the posts, not digging them, so we don’t need quite so many people. What we do need is the traffic control crew of about 6 or7 (at least for the morning work on Everitt Mem Hwy), a small crew to handle the signs themselves, and a small crew to handle the posts. If we dig any holes with an augur, then perhaps we’ll need someone with a pickup to go get some gravel.
Let me know if you can help and I’ll divide up the work. Final announcement will go out tomorrow evening with times and locations. Thank you.