It’s time to install the kiosk for the Learning Zone Trailhead at the Nordic Center. The hard work is done: Trail Labs excavated the hole, so we don’t have to dig like we did at McBride Trailhead (see below). We will place the steel posts, level them, attach the temporary aluminum panels, and mix/pour some concrete. Easy as pie.
Come for a few minutes or an hour or two. Stand and bark orders at the rest of us. Join the happy confusion and pleasant chaos that goes with this work. Bring some extra water for mixing/cleaning concrete and a wheelbarrow if you have one. I’ll have everything else. Meet in the Nordic Center parking lot–the work is right there, so no hiking.